Search

The measurement gap

Why metrology and inspection is outgrowing the industry’s ability to supply it

Written Clara Grevic, Yole Group for Semiconductor Digest – Metrology and inspection are the only family of process steps that add nothing to the wafer. Nothing is deposited, nothing is etched, no pattern is printed. It is therefore the first line under pressure when capacity is short, and the last thing anyone can afford to skip. That tension is not new. What has changed is its scale.

Wafer fab equipment is in one of the strongest cycles this industry has seen. Our current forecast points at around $162 billion in 2026, up about 25% on 2025. Metrology and inspection (M&I) now take roughly 14% of that spending, against 11.3% in 2018. Six months ago, in the Q1 edition of our Wafer Fab Equipment Market Monitor, we published our view of the segment, and we have since revised it upwards: the 2031 market moves from $24.7 billion to $31.4 billion, and the correction we had placed in 2028 now sits in 2029. Memory explains most of that revision, and AI explains memory. That chain, from AI to memory to metrology, is why the segment can’t be read in isolation from the broader equipment and memory cycle. 

Why the gap is opening

Start with the tools themselves. In lithography, resolution and throughput improve together along the roadmap, and ASML has led that for two decades. M&I has no equivalent axis. Resolution, sampling area and measurement physics trade directly against throughput, and no single technique delivers full wafer coverage, high resolution and short measurement time at the same time. Chipmakers therefore choose what to give up. Defect inspection and mask M&I are the fastest rising cost lines in the segment, and in both cases, resolution is precisely what cannot be traded away.

The second constraint sits in the supply base. Lead times at the five largest equipment suppliers have stretched by a factor of 1.5 to 2. Etch and deposition now run at about twelve months, advanced packaging and test beyond eighteen. Raw materials are not the main problem, as the subsystem makers tell it. There is simply not enough floor space to build the subsystems, not enough people in Singapore and Malaysia to run the lines and qualifying a new factory to an OEM’s satisfaction can take more than a year. Part of the market growth we report is also price rather than volume: tools are roughly 10% more expensive than last year, and the Average Selling Price (ASP) of High NA EUV systems shows how far that can go.

Hence a question we keep coming back to: does the real ceiling on growth sit with the subsystem and component suppliers rather than with the tool makers?… Full article in Semiconductor Digest magazine, page 44.

Want to read more? This content is reserved for registered users.
up